QUANTUM PRESS MOUNT INSTALLATION INSTRUCTIONS |
- Clean floor,
removing all oil, grease and debris.
- Bring press
into location and raise it sufficiently to allow mounts to be
positioned under the mounting feet.
- Remove the
leveling bolts from mounts. Keep each leveling bolt and mounts
together as a set, so that the stamped number on the housing and
the bolt match head.
- Position
mounts with bolt holes, aligned with holes in press feet. Insert
leveling bolts through bolt holes in press feet and screw into
bolt holes in mounts.
- Lower press
onto mounts so all mounts accept uniform loading.
- After 20
minutes (allowing the press to "settle in" ) locate
the mount-housing closest to the floor and elevate it to 1/4"
off the floor. Level the press by adjusting the other mounts using
the first mount as the point of reference. On large presses it
may be necessary to assist lifting the press by external means
while adjusting leveling bolts.
- The torques
on the leveling bolts should be reactively equal, signaling equal
load distribution.
- Tighten nuts,
thus securing press feet to mounts.
- After 2 hours
and after 24 hours of press operation recheck lowest housing to
make sure it does not contact the floor when the press cycles.
Follow press manufactures recommendations for frequency of level
verification throughout life of the press.
|
Click To View Technical Data Sheet |
SPECIFICATIONS
|
Mount
Series
|
L*
|
W*
|
H8
(min.)
|
Standard
Bolt Size*
|
PM-81
|
8.00
|
5.88
|
2.50
|
0.75
thru 1.25
|
PM-101
|
10.00
|
7.88
|
3.25
|
0.75
thru 1.50
|
PM-121
|
12.50
|
9.00
|
3.50
|
1.00
thru 1.75
|
Pm-161
|
16.00
|
12.50
|
4.50
|
1.25
thru 2.25
|
PM-201
|
20.00
|
16.00
|
6.00
|
1.75
thru 3.00
|
PM-261
|
26.00
|
22.00
|
7.50
|
2.50
thru 4.00
|
PM-301
|
30.00
|
24.00
|
9.50
|
3.00
thru 4.50
|
PM-321
|
32.00
|
24.00
|
10.50
|
3.00
thru 5.00
|
PM-381
|
38.00
|
25.50
|
13.00
|
4.00
thru 6.00
|
|